What phase of program planning is the execution of the plan?
a. Evaluation
b. Development
c. Implementation
d. None of the above.

Respuesta :

valetta valetta
  • 05-09-2019

Answer:

Implementation phase

Explanation:

The Implementation phase is the phase that involves the actual execution of the work that is the work starts to be done on the ground or site.

The Evaluation is the phase involving the estimation, planning and calculations.

Development phase deals with the tasks related to the arrangement and planning of the things required for the implementation of the work.

Answer Link

Otras preguntas

One beneficial use of radioisotopes is (1) detection of disease (2) neutralization of an acid spill (3) decreasing the dissolved O2(g) level in seawater (4) inc
What are two Cabinet-level positions?
What does the President’s Cabinet do?
Compared to the physical and chemical properties of the compound NO2 the compound N2O has (1) different physical properties and different chemical properties (2
What does the President’s Cabinet do?
Which condensed structural formula represents an unsaturated compound? (1) CH3CHCHCH3 (3) CH3CH3 (2) CH3CH2CH3 (4) CH4
Where is the Statue of Liberty?
There were 13 original states. Name three.
Given the balanced ionic equation: 3Pb2+ + 2Cr ==> 3Pb + 2Cr3+ What is the number of moles of electrons gained by 3.0 moles of lead ions? (1) 5.0 mol (3)
The coefficients in a balanced chemical equation represent (l ) the mass ratios of the substances in the reaction (2) the mole ratios of the substances in the r