​Finishing the construction of a home two days after the contract called for completion (no injury occurs) most likely will be considered

Respuesta :

andriansp andriansp
  • 08-06-2016
Finishing the construction for a longer period than the date that already agreed upon would be most likely considered : Breach of Contracts.
Which mean that the constructor basically fail to met his end of the contract agreement, causing the other party has the right to walk out from their contract
Answer Link

Otras preguntas

Hello please show a a ratio table for this, explanation thank you!!
Lewis dot structures show an element's symbol as well as its ______ ______, represented by dots. A.core electrons B.excited electrons C.valence electrons
Describe the structure of a water
Which rising action would best help develop the theme it’s important to believe in yourself Look at the picture
please some one help me 77/6x-14+1/6x
At what point in a narrative is the main character most likely to experience a change? Exposition Rising Action Climax Resolution
What is the Purpose of the “Ode on a Grecian”
How have Native Americans shaped the culture and land of the United States?
Explain the difference between politics and government.
Given that a 18.00 g milk chocolate bar contains 11.00 g of sugar, calculate the percentage of sugar present in 18.00 g of milk chocolate bar keeping in mind th