Sadeghshakeri97 Sadeghshakeri97
  • 02-12-2019
  • Mathematics
contestada

60% of the work is done in 17 minutes, 40% of the same work, when is done (in minutes)?

Respuesta :

bridgecostello bridgecostello
  • 02-12-2019

Answer:

It would be 11.333 minutes

Step-by-step explanation:

I solved this by setting up a cross multiplication.

60%/17 so then 40/x.

Then here cross multiplying. 60x=680. divide by 60 and x would = 11.33

Answer Link

Otras preguntas

You pull a 100 N object up a ramp with only 20 N of force. Find MA.
3(x + 1) + 4x + 3 = 34
suppose the model boat were traveling at a rate of 4 feet per second. How long would it take the model boat to get from the edge of the pond to the center
The average worker in China makes $5,000/year. Wages are keeping up with GDP growth of 7%/year. Assuming a constant growth rate, how long will it take for the a
A water bath in a physical chemistry lab is 1.85m long, 0.810m wide and 0.740m deep. If it is filled to within 2.57 in from the top, how many liters of water ar
430×23=?Show your work​
Parker was able to pay 44% of his college tuition with his scholarship.The remaining $10,054.52 he paid for with a student loan.What was the cost of Parker's tu
What is 46 + 4x equals -6 + 76
what is the genotypic ratio and phenotypic ratio for a monohybrid cross between heterozygotes that follow mendel's laws​
Network a0 is a process by which several protocols evolve to form a single product.