jeevenjoji2007
jeevenjoji2007 jeevenjoji2007
  • 01-09-2020
  • Mathematics
contestada

if 12 people can finish a job by 5 days how many days will be required finish the same job by 10 people

Respuesta :

ishashunnny
ishashunnny ishashunnny
  • 01-09-2020

Answer:

4

Step-by-step explanation:

12p=5d

1p=5/12

10p=4.1666

≈4 days

Answer Link

Otras preguntas

Which of the following graphs correctly represents the relationship between the pressure and the volume of an ideal gas that is held at constant temperature?
Find the slope of the line whose equation is px - qy = r + 1.
what are the solution(s) to the quadratic equation 9x2 = 4? x = 4/9 and x = -4/9 x = 4/9 and x = -2/3 x = 3/2 and x = -3/2 no real solution
greg rented a truck for one day. there was a base fee of $19.95 , and there was an additional charge of 82 cents for each mile driven. greg had to pay $178.21 w
they take a serpentine course, their arms flash in the sun hark to the musical clank whitman, from "cavalry crossing a ford" how would the poem change if "music
what is 15 to the 5 power
when did the human brain achieve its modern size
for his long distance phone service, manuel pays a $2 monthly fee plus 12 cents per minute. last month, manuel's long distance bill was $14.36 . for how many mi
what early river civilization does the chart describe?
64 g of sulfur dioxide (SO2) contains 32 g of oxygen. Calculate how much sulfur it contains. It contains 32g of sulfur. Describe what the answer to Exten