kadenceclay26
kadenceclay26 kadenceclay26
  • 03-10-2016
  • Mathematics
contestada

a contractor's crew can frame 3 houses in a week. How long will it take them to frame 54 houses if they frame the same number each week?

Respuesta :

charstar
charstar charstar
  • 03-10-2016
54/3=18

hope this helps :)
Answer Link

Otras preguntas

Biochemistry lab is worth 25% of your total MCB 2000 course grade. Of that 25%, the weekly laboratory reports account for 45%. From this 45%, 10% is for partici
If a gun is fired straight up and has a muzzle velocity of 424 m/s how long will it take the bullet to reach its maximum height? I need a lot of help.
198 cans of food consisted of both veggies and fruits. if 1/3 of the cans were veggies how many cans were not veggies?
A poker hand consists of five cards selected from a 52 card deck. The order of the cards in a poker hand does not matter. A poker hand is called a full house if
two coins are tossed. find the sample space. the successful event is that atleast one of the coins shows heads. is it a compound event or a simple event?​
How many inches are in 72.0 meters? How many yards is this?
Stefan-Boltzman’s law is an equation that allows you to calculate __________, if you just know the temperature of the body.
Eukaryotic cells contain DNA in the mitochondria and chloroplasts (in addition to the nucleus). Is the organization of DNA in these organelles more similar to b
How did the discovery of gold in California impact western expansion? Select two correct answers A. It accelerated migration to the west coast B. It caused man
How do I do these? My teacher didn’t show us how.