medm0om5iebernan medm0om5iebernan
  • 01-11-2016
  • Mathematics
contestada

A construction company delivered 40 loads of concrete in 5 days.

What was their rate of work?



A.




B.




C.




D.


Respuesta :

melhunt99
melhunt99 melhunt99
  • 05-11-2016
Well 40 divided by 5 is 8 and you don't have options so I would say 8 loads a day :)
Answer Link

Otras preguntas

Stan works on an assembly line. What effective and appropriate approach would he be wise to use when coping with minor frustrations like hang-ups on a conveyor
Antonio sold a hat for $18. His wholesale cost was $8. What was the percent markup?
can you simplify 25/4? if so, how?
List five kinds of cases that come under the judicial power of the United States courts.
If a potato is allowed to dehydrate by sitting in open air, would the potato cells be more likely to absorb more water or less?
Translation: how long has it been?
Which words in this sentence are common nouns? The American people listened to President Roosevelt's speech. Choose all answers that are correct. A. speech B.
What served as the basic building blocks of African society?1: feudal contracts2: lineage groups3: slaves4: camel caravans
What is the connection between 2.3 times 6.9 and 6.9 divided by 2.3.
How and where has oil, road development, mining, dams and agriculture contributed to local economic, political, and land use issues?