maaf34nb8f maaf34nb8f
  • 01-04-2021
  • Engineering
contestada

A short framing member that fills the space
between the rough sill and the soleplate is a

Respuesta :

iBear25k
iBear25k iBear25k
  • 01-04-2021

A short framing member that fills the space between the rough sill and the soleplate is a cripple stud.

(HAVE A GOOD DAY!!!)

Answer Link

Otras preguntas

We can rewrite the expression 16+8 as 8 x (2+1). Notice that 8 is the greatest factor of 16 and 8. Use this same method to rewrite the expression 24+36 as the p
please answer the above question?​
How does DNA help with the transfer of genetic material from parents to offspring? A) Enzymes break down DNA, releasing amino acids that join to form proteins a
How many moles are in a 63.60 g sample of carbon? (the molar mass of carbon is 12.01 g/mol.)
Which represents r in terms of A and S?
Solve the equation. 5y – 1 + y = 34 + 4y – 5y
How did the invading Huns contribute to the fall of the western Roman Empire? A)By sacking the city of Rome in 410 C.E. B)By completely disrupting trade along t
x^4-64=0The examples we did in class had solutions like "x=+-2" and "x=+-i(square root)3.​
Emily has four less than three times the number of necklaces as Maggie has. Emily has six necklaces. How many necklaces does Maggie have?
How did the sewing machine in the washing machine change life for American woman