Consider the following project network and activity times (in weeks): Activity A B C D E F G H Time 5 3 7 6 7 3 10 8 How much time will be needed to complete this project

Respuesta :

codiepienagoya codiepienagoya
  • 04-07-2021

Answer:

Please find the attached file of the complete question:

Explanation:

Please find the attached file of the solution:

Critical Path:  ACH

Duration: 21

Because C is on the Critical Path, it cannot be postponed without causing the project to be delayed.

E is not on the critical path, thus it may also be delayed by two weeks without causing the project to be delayed.

[tex]D : ES : 6, EF : 10, LS : 7, LF : 11[/tex]

Ver imagen codiepienagoya
Ver imagen codiepienagoya
Answer Link

Otras preguntas

The sum of three integers is 92. The second number is three times the first number. The third number is ten less than twice the first number. Find the integers.
The population of Vietnam is approximately 4 times the population of Australia. The population of Brazil is approximately 8 times the population of Australia. T
What is la patente mean in a sentence
how to solve (4x-7)^2=44
why is south asia land likely to have earthquakes
Any ideas for a science fair project involving anything with anime, anime art, baking, desserts, something about cuteness, or anything else that might be good!
Steps on how to solve 50=40e^0.027x
How long would it take 2.0x10^20 electrons to pass through a point in a conductor if the current was 10.0A?
When you add 18 to 1/4 of a number you get the number itself
If stockholders own the corporation, how do they control and manage it? Each stockholder is responsible for directing a different department of the corporation.