krishnashrrstha41
krishnashrrstha41 krishnashrrstha41
  • 04-08-2021
  • Mathematics
contestada

15men can complete a piece of work in25days. how many men should be added to complete the same work in15days.​

Respuesta :

mhanifa
mhanifa mhanifa
  • 04-08-2021

Answer:

  • 10 men

Step-by-step explanation:

Amount of work done by 15 men is:

  • 15 men *25 day = 15*25 man*days

Same work can be done by 25 men, in 15 days, so 10 more men should be added.

Answer Link
abovejosh
abovejosh abovejosh
  • 04-08-2021
Answer: 10 men explanation: guy above me
Answer Link

Otras preguntas

what are two things we should be careful about when using adverds
for each question trent gets correct on each quiz, he earns 5 points. he can also earn an extra 15 bonus points on the quiz. which expression shows the total po
How MIGHT the location of the Chattahoochee River have contributed to the development of trade in Georgia? A) The natural beauty of the river continues to attra
Is dna copied before meiosis 2
What would be labor’s first step in solving labor problems and effecting change
In The Communist Manifesto, Karl Marx hypothesized that capitalism would fail if workers _________________
what is the decimal form of -4 7/8
what part of colonial culture does the Gullah dialect reflect
the component of exercise that's most often overlooked is
if the ríbbon costs 10 cents per foot what is the total cost of ribbon in dollars