8 students take 18 hours to construct a raft.
If the raft needs to be completed 12 hours earlier, calculate how many more students are needed.

Respuesta :

devishri1977
devishri1977 devishri1977
  • 04-08-2021

Answer:

16

Step-by-step explanation:

Students                      8       x

Time taken (hours)     18     18 - 12 = 6

If number of students increases, the work will completed in less hours.

So inverse proportion

[tex]x =\frac{18*8}{6}=3*8 = 24[/tex]

Additional students required = 24 - 8 = 16

Answer Link

Otras preguntas

CTSO are especially helpful for people who are applying for which things
1 2 3 Month 4 5 6 Texts used 41 26 32 35 37 43
Select the correct answer. Which of the following could make it difficult for a student to get a housing or vehicle loan in the future? A not filing the FAFSA e
What are some facts about religious freedom
Create a data definition class to model one product sold at a bakery. The product will have a description, cost, and quantity in stock. Instance methods include
Which statement best compares and contrasts two physical properties of matter? Density and solubility are similar because they both involve water, but they are
Football player A has a mass of 110 kg, and he is running down the field with a velocity of 2 m/s. what is the momentum
How is total revenue calculated
Which of the following elements is rarely found in organic molecules? a: Magnesium b: Hydrogen c:Carbon d:Oxygen
What is the relationship between the degree of a function and the degree of the derivative?​