Victoriacaulder4
Victoriacaulder4 Victoriacaulder4
  • 04-10-2021
  • History
contestada

What are the risks involved in choosing to build within one kilometer of a site such as Teotihuacan?

Respuesta :

zarampa
zarampa zarampa
  • 04-10-2021

Answer:

Explanation:

The risk is the cancellation of construction due to the high possibility of an anthropological find.

Another risk is the protests of people who feel offended by an alleged invasion of an ancestral territory.

Answer Link

Otras preguntas

What is one jewish nonreligious cultural characteristic (traditions, customs etc.)
Recall that the slope of a non-vertical line is a measure of the number of units the line rises (or falls) vertically for each unit of horizontal change from le
Of these layers of the atmosphere, which is the least dense? A. exosphere B. stratosphere C.troposphere D. mesosphere
what is the value of –3 • (7 (–3)2) ÷ 3? a. 13 b. –2 c. –16 d. –48
volume of a pyramid 10 feet by 10 feet base and height of 8.5 feet
what does foreshadowing provide the reader in a story?
compare square root of 6 and square root of 8
Write a comment on the following statement: Texting should be made more expensive so that users are not in danger of losing their reading skills.Can somebody he
Which of these polymers is responsible for your inheritance? 1.carbohydrates 2.DNA 3.lipids
identify the coefficient of the term -2mnp