hannahgrace31511 hannahgrace31511
  • 03-11-2021
  • Mathematics
contestada

A chef can finish a catering job in 4hr. His student can do the same job in 12hr. How long will it take them both to do the job if they work together

Respuesta :

shayy1616 shayy1616
  • 03-11-2021
12 divided by 4 equal 3
Ans:3hrs
Answer Link

Otras preguntas

What rules does Jonas's father disobey
6.5 write in word form
How do you translate "fifty-three plus four times c is as much as 21" in an equation
How do you translate "fifty-three plus four times c is as much as 21" in an equation
a mulberry silk worm can spit a single thread the measure up to 3,900 ft in length. write the number in scientific notation?
If  lies in the quadrant IV. What can be the value of cos  ?
Death Valley has an elevation if -282 feet relative to sea level. Explain how to use absolute value to describe the elevation of Death Valley as a positive inte
how to write 0.632 in wordform please show an example
What's the algebraic expression of "15 less than a number squared"?
a=(vf-vi)/t solve for vf