winniecollor winniecollor
  • 01-02-2022
  • English
contestada

What wartime work was done at Langley?

Respuesta :

Cl0udySki3s Cl0udySki3s
  • 01-02-2022

Answer: Drag cleanup

Explanation:

Drag cleanup work continued throughout the war at Langley as well as at the Ames laboratory which opened a still larger full-scale tunnel of its own.

Answer Link

Otras preguntas

A carpenter used 9 1/2 ft of cedar for every 7 2/3 ft of redwood for a construction project. If the carpenter uses 4 3/4 ft of cedar, how much redwood does he n
The 62 km long Balto Glacier moves through the Gasherbrum Mountains of Pakistan at a rate of 4 inches per day. How many kilometers does the glacier move in a ye
If you want to protect your computer so that it requires a password when resuming from a screen saver in Windows 7 in which of the following locations will you
In 1590, which early American colony disappeared without a trace?
Archaeological sites in N.M for early humans
what did the Presbyterians believe and why
A gallon of stain can cover a square deck with an area of 300 square feet.about how long is each side of the deck?round your awnser to the nearest foot.
The persian ruler darius divided his empire into provinces called
Let's write describe that your a grandfather and you visited a zoo what did you do there
a stack of 500 sheets of paper is 1.875 inches tall. Diego guess that each piece of paper and 0.015 inches thick. Explain how you know Diego is incorrect.