Jrorockets6973 Jrorockets6973
  • 02-02-2022
  • Business
contestada

The specific term for attaching a direct cost with a cost object.

Respuesta :

adefioyelaoye
adefioyelaoye adefioyelaoye
  • 07-02-2022

The specific term for attaching a direct cost with a cost object

is Cost assignment.

What is Cost?

This refers to the price or estimate which has to be paid for the

purchase of goods and services. Costs could either be direct or

indirect depending on various factors.

The attachment of a direct cost with a cost object is therefore

referred to as cost assignment.

Read more about Cost Assignment here https://brainly.com/question/481029

Answer Link

Otras preguntas

What is a expression that is equivalent to 4(6x+ x)
Izzati, Ai Ling, Rina and Susan share some stamps. Izzati and Ai Ling take 1/4 and 1/8 of the total number of stamps respectively. After that, Rina takes 7/10 o
Use the associative property to simplify 3(4x).
I need to know what is 1+1
plsssssssssssssssssssssssssssssss help;ppppppp What is the capitol of Massachussetts> Cambridge Boston Springfield Cape Cod
Molecular geometry of AX2E
GIVING BRAINLIEST IN A HURRYFrom the information in the graph, what is the mode number of books the girls read?A) 3B) 4C) 5D) 6
Camilla cut a piece of string 6 m 50 cm long into 2 pieces One piece is 265 cm long. How long, in meters and centimeters, is the other piece?
An emergency room doctor prescribes a certain pain medication to be delivered through an IV drip. She prescribes 800 mL of the medication to be delivered over
what year was someone born in if they turned 17 on February 12th of this year?