jamesrobison jamesrobison
  • 02-02-2017
  • Mathematics
contestada

A construction company is digging a hole for a swimming pool the whole will be 12 yards long 7 yards wide and 3 yards deep how many cubic yards of dirt will the company need to remove

Respuesta :

euqinimod
euqinimod euqinimod
  • 02-02-2017
12 * 7 * 3 = 252

the company will need to remove 252 cubic yards of dirt.
Answer Link
princess2321
princess2321 princess2321
  • 02-02-2017
It will be 252 cubic yards of dirt that the company will need to remove
Answer Link

Otras preguntas

How have waterways most influenced human settlement in South Asia? A. Most People live along the coast of the Arabian Sea and Indian Ocean to better conduct tr
There are 3 yellow, 5 red, 4 blue, and 8 green candies in a bag. Once a candy is selected, it is not replaced. Find the Probability of: P(Two red candies) P(Two
How to do these/ answers to check it
n/5=10. x/1=9 a/5=3 c/7=9 i need to know what the variables are
what porposes you see in action in everyday life
is 49 prime or composite
If a satellite or spaceship explodes in outer space, you can see the explosion from a distance but you cannot hear it. Why? A) Light waves travel very fast and
the molar mass of Ba(OH)2
a brief national anthem for the Bear Flag Republic. some words to inspire people
4/50 in lowest form