An experienced carpenter could build a house in 5 days. How much would he have finished if he worked for 3 days?

Respuesta :

MIniNAchoz
MIniNAchoz MIniNAchoz
  • 01-03-2017
I think it would most likely be  3/5
Answer Link
snoopynfriends
snoopynfriends snoopynfriends
  • 01-03-2017
he would have 8 this is the answer
Answer Link

Otras preguntas

What kind of friction exists between solid objects moving in water? static friction sliding friction rolling friction drag
jordan has some music books. he will buy 9 new music books each year. he will have 52 music books in 5 years. Rate of change per year= ___ Initial value = ____
Write Caminar infinitive verb in their affirmative “tú” command form.
part 1. Please show work. Please assist me with these math problems. ​
What is being done to address human rights violations?
how can we help out grandparents​
Which is released during the formation of a peride bond? A five-carbon sugar An amino group An amino acid A water molecule
Arrange the trigonometric functions in increasing order of their values cos π/6 sin π/6 cos π/2 sin π/2 cos π/4
You are conducting a study to see if the proportion of men over the age of 50 who regularly have their prostate examined is significantly less than 0.37. A rand
Practice using experimental probability. Asment The experimental probability of getting a 3 on a number cube is 5/36. Which of the following is true about the e