agyasmithmartersax agyasmithmartersax
  • 01-05-2017
  • Mathematics
contestada

An average of 2,000 charts need to be coded each month. if it takes an average of 15 minutes to code each chart— how many charts does the average coder code per 8-hour day?

Respuesta :

Bea1111 Bea1111
  • 01-05-2017
Put 8 hours into minutes which is 60•8= 480.
Then divide 480 by 15 to find how many charts are coded in 8 hours by a coder.
480/15= 32.

So the average worker codes 32 charts per 8-hour work day.
Answer Link

Otras preguntas

write the rate 1/7 inch ----------------- as a unit rate 1/14 minute
Venn Diagram: In a school all of the 120 pupils must choose at least one of Archery, Badminton or Cycling. 63 pupils choose archery 62 pupils choose badminton
why is water so important in metabolism
Give a counter example to this statement. The quotient of two fractions between 0 and 1 is always a whole number.
Trent and Chris are musicians, and they recently played a concert for 20,000 fans. The rectangular venue measured 87 yards by 57 yards. What was the approximate
shanes neighbor pledged 1.25 for every 0.5 miles that shane swims in the charity swim-a-thon.if Shane swims 3 miles,how much money will his neighbor donate?
Why is man a special creature? What two worlds does he share in?
Mr Jones has 20,000 to invest. He invests part at 6% and part at 7%, if hr earns 1,280 in interest after 1 year, how much did he invest at each rate.
How is the graph of y=-8x^2-2 diffrent from the graph of y=-8x^2
What process in animal cells required oxygen